EPFA operation & maintenance.
Installation, monitoring and qualified maintenance guidance for EPFA-24 through EPFA-144. Find the relevant section below or open the complete manual.
Current equipment reference · project coordination still required
This companion helps owners, facility managers, operators, installers, service personnel, engineers, and AHJs find the manual's essential information online. It does not replace unit labels, current project documents, qualified work, permits, testing, or AHJ review.
- Document
- EPFA-IOM-2026
- Revision
- Rev A
- Revision date
- July 2026
- Format
- 24-page print PDF
Before installation or startup
Coordinate the complete exhaust and service path
EPFA is installed between the kitchen hood and exhaust fan. The project team coordinates the equipment with the duct, fan, supports, access, drains, monitoring supply, fire suppression, permits, and testing.
Receiving and placement
- Confirm the model, serial number, accessories, airflow direction, and service side.
- Document shipping damage or missing items before installation.
- Preserve the 30-in. minimum service-side clearance and the applicable material clearance.
- Provide a same-height service platform where above-ceiling placement requires one.
Project interfaces
- Coordinate the two bottom support channels, roof curb or suspension, and project anchorage.
- Complete welded inlet and outlet grease-duct connections.
- Route the three cleaning drains to the project drain and grease-interceptor arrangement.
- Complete the building sprinkler connection or optional factory ANSUL pre-piping path through the responsible field parties.
Technical reference
EPFA technical data
Use current unit labels and project documents for installation and commissioning. The manual does not publish a common-terminal number or a complete construction wiring diagram.
| Item | Manual reference |
|---|---|
| Listing scope | UL Listed under File MH45752; models EPFA-24 through EPFA-144 were investigated to the UL 8782 Outline of Investigation for Pollution Control Units for Commercial Cooking Operations |
| Filter sequence | F1 MERV 9 · F2 MERV 14 · F3 MERV 14 or optional carbon |
| Initial EPFA resistance | 1.54 in. w.g.; add hood, duct, discharge, and other system losses |
| Monitoring supply | 120 VAC; no circuit-amperage value is established by this manual |
| Running indication | Green indication closes at 1.5 in. w.g. |
| Service indication | Red indication at the selected 2–5 in. w.g. high-static setting |
| Basic enclosure length | 63 in.; width follows the EPFA model suffix |
| Service-side clearance | 30 in. minimum |
| Other-side clearance | 18 in. minimum air space to combustible materials and building insulation, or zero clearance to noncombustible materials |
| Routine interval | Inspect and service every four weeks; respond immediately to a flashing red service indication |
Product Listing does not establish project approval, code approval, suitability, or AHJ acceptance for a particular installation. Final fan selection must include all system losses.
Status panel
Respond to the indication without changing factory settings
Keep the indoor panel visible for daily monitoring and record the indication, gauge reading, date, and service action.
Green running indication
Continue normal facility operation, keep the panel visible, maintain the four-week inspection cycle, and record abnormal conditions.
Flashing red service indication
Respond immediately, record the light and gauge condition, and arrange qualified filter inspection and service. Do not treat control readjustment as an operator action.
No light, both lights, or unstable indication
Record the condition and route it to qualified service. Do not open energized controls or guess at terminal relationships.
Maintenance and records
Use a repeatable qualified-service cycle
The manual combines scheduled inspection, filter service, qualified steam cleaning, condition response, and retained records.
- 01
Inspect
Check the status indication and gauge, access doors, gaskets, filter fit, drains, and visible equipment condition.
- 02
Service filters
Preserve the F1/F2/F3 order, install filters individually without overlap, and maintain the documented gasket relationship.
- 03
Clean safely
Qualified personnel control energy, protect the controls, use the cleaning drains, steam-clean accessible stainless surfaces, inspect, and dry before return to service.
- 04
Record and respond
Record the date, readings, filter actions, cleaning, technician, next due date, and unresolved conditions with the equipment records.
Printable equipment records
Rev A includes a receiving record, owner acknowledgment, contractor pre-start checkoff, contractor identification record, factory startup and monitoring record, maintenance log, and a 17 × 11-in. installation and commissioning foldout. These are printable writing pages; the PDF contains no interactive form fields or hidden submission behavior.
Responsibilities
Keep each handoff explicit
The manual supports coordination, but it does not transfer project design, safe-work, installation, testing, permitting, or acceptance responsibilities to the document.
| Participant | Manual responsibility |
|---|---|
| Owner or facility manager | Retain the manual, schedule the four-week inspection and service cycle, keep equipment records, and arrange qualified support when a red or abnormal indication occurs. |
| Operator | Keep the indoor status panel visible, recognize normal and service indications, record abnormal conditions, and avoid opening energized controls or changing factory settings. |
| Qualified installer | Coordinate access, duct connections, support, drainage, monitoring electrical work, fire suppression, labels, and project documents before startup. |
| Factory representative | Perform startup, verify the supported operating condition, record the selected high-static setting, and complete the owner/facility handoff. |
| Qualified service personnel | Inspect filters, gaskets, doors, drains, controls, and accessible stainless interior surfaces using current unit-specific information and safe work practices. |
EPFA manual · Rev A
Download the complete 24-page manual
Rev A includes the full receiving, installation coordination, monitoring, startup, maintenance, filter service, cleaning, troubleshooting, warranty, printable record, and 17 × 11-in. foldout content.
Need help with an installed EPFA?
Send the model, serial number, facility, status-panel condition, gauge reading, maintenance history, and photos of the unit labels when available.