EPFA operation & maintenance.

Installation, monitoring and qualified maintenance guidance for EPFA-24 through EPFA-144. Find the relevant section below or open the complete manual.

Current equipment reference · project coordination still required

This companion helps owners, facility managers, operators, installers, service personnel, engineers, and AHJs find the manual's essential information online. It does not replace unit labels, current project documents, qualified work, permits, testing, or AHJ review.

Document
EPFA-IOM-2026
Revision
Rev A
Revision date
July 2026
Format
24-page print PDF

Before installation or startup

Coordinate the complete exhaust and service path

EPFA is installed between the kitchen hood and exhaust fan. The project team coordinates the equipment with the duct, fan, supports, access, drains, monitoring supply, fire suppression, permits, and testing.

Receiving and placement

  • Confirm the model, serial number, accessories, airflow direction, and service side.
  • Document shipping damage or missing items before installation.
  • Preserve the 30-in. minimum service-side clearance and the applicable material clearance.
  • Provide a same-height service platform where above-ceiling placement requires one.

Project interfaces

  • Coordinate the two bottom support channels, roof curb or suspension, and project anchorage.
  • Complete welded inlet and outlet grease-duct connections.
  • Route the three cleaning drains to the project drain and grease-interceptor arrangement.
  • Complete the building sprinkler connection or optional factory ANSUL pre-piping path through the responsible field parties.

Technical reference

EPFA technical data

Use current unit labels and project documents for installation and commissioning. The manual does not publish a common-terminal number or a complete construction wiring diagram.

ItemManual reference
Listing scopeUL Listed under File MH45752; models EPFA-24 through EPFA-144 were investigated to the UL 8782 Outline of Investigation for Pollution Control Units for Commercial Cooking Operations
Filter sequenceF1 MERV 9 · F2 MERV 14 · F3 MERV 14 or optional carbon
Initial EPFA resistance1.54 in. w.g.; add hood, duct, discharge, and other system losses
Monitoring supply120 VAC; no circuit-amperage value is established by this manual
Running indicationGreen indication closes at 1.5 in. w.g.
Service indicationRed indication at the selected 2–5 in. w.g. high-static setting
Basic enclosure length63 in.; width follows the EPFA model suffix
Service-side clearance30 in. minimum
Other-side clearance18 in. minimum air space to combustible materials and building insulation, or zero clearance to noncombustible materials
Routine intervalInspect and service every four weeks; respond immediately to a flashing red service indication

Product Listing does not establish project approval, code approval, suitability, or AHJ acceptance for a particular installation. Final fan selection must include all system losses.

Status panel

Respond to the indication without changing factory settings

Keep the indoor panel visible for daily monitoring and record the indication, gauge reading, date, and service action.

Green running indication

Continue normal facility operation, keep the panel visible, maintain the four-week inspection cycle, and record abnormal conditions.

Flashing red service indication

Respond immediately, record the light and gauge condition, and arrange qualified filter inspection and service. Do not treat control readjustment as an operator action.

No light, both lights, or unstable indication

Record the condition and route it to qualified service. Do not open energized controls or guess at terminal relationships.

Maintenance and records

Use a repeatable qualified-service cycle

The manual combines scheduled inspection, filter service, qualified steam cleaning, condition response, and retained records.

  1. 01

    Inspect

    Check the status indication and gauge, access doors, gaskets, filter fit, drains, and visible equipment condition.

  2. 02

    Service filters

    Preserve the F1/F2/F3 order, install filters individually without overlap, and maintain the documented gasket relationship.

  3. 03

    Clean safely

    Qualified personnel control energy, protect the controls, use the cleaning drains, steam-clean accessible stainless surfaces, inspect, and dry before return to service.

  4. 04

    Record and respond

    Record the date, readings, filter actions, cleaning, technician, next due date, and unresolved conditions with the equipment records.

Printable equipment records

Rev A includes a receiving record, owner acknowledgment, contractor pre-start checkoff, contractor identification record, factory startup and monitoring record, maintenance log, and a 17 × 11-in. installation and commissioning foldout. These are printable writing pages; the PDF contains no interactive form fields or hidden submission behavior.

Responsibilities

Keep each handoff explicit

The manual supports coordination, but it does not transfer project design, safe-work, installation, testing, permitting, or acceptance responsibilities to the document.

ParticipantManual responsibility
Owner or facility managerRetain the manual, schedule the four-week inspection and service cycle, keep equipment records, and arrange qualified support when a red or abnormal indication occurs.
OperatorKeep the indoor status panel visible, recognize normal and service indications, record abnormal conditions, and avoid opening energized controls or changing factory settings.
Qualified installerCoordinate access, duct connections, support, drainage, monitoring electrical work, fire suppression, labels, and project documents before startup.
Factory representativePerform startup, verify the supported operating condition, record the selected high-static setting, and complete the owner/facility handoff.
Qualified service personnelInspect filters, gaskets, doors, drains, controls, and accessible stainless interior surfaces using current unit-specific information and safe work practices.

EPFA manual · Rev A

Download the complete 24-page manual

Rev A includes the full receiving, installation coordination, monitoring, startup, maintenance, filter service, cleaning, troubleshooting, warranty, printable record, and 17 × 11-in. foldout content.

Open EPFA manual · Rev A (PDF)

Need help with an installed EPFA?

Send the model, serial number, facility, status-panel condition, gauge reading, maintenance history, and photos of the unit labels when available.